Western Harbour Tunnel is Hong Kong's first dual 3-lane harbour tunnel constructed between Sai Ying Pun and the West Kowloon Reclamation. It is the largest harbour tunnel in Hong Kong. The immersed tube tunnel is 1,363 m in length with designated driving speed limit of 70 km per hour. Its practical capacity is 180,000 vehicles a day, 50% greater than each of the existing tunnels. There are 2 bus interchanges located at either side of the toll plaza. The administration building is 3-storey with a total gross floor area of 4,280 sq m.
Toll booths and lanes, administration building, bus interchanges, reversible ventilation fans, jet fans for smoke control, environmental sensors, emergency telephones, CCTV cameras, etc
Apply in writing to the General Manager with information on the location, date, time, production theme, description of the scenes, size of the crew, supply of electricity and equipment to be used.
Processing time is to be considered on a case-by-case basis.
Negotiable
Applications will be considered on a case-by-case basis.
Compliments to the government and public bodies that have agreed to consider applications to hire premises or facilities under their management for location filming.