Opened in 2007, the EcoPark of Environmental Protection Department covers a site area of 20 hectares. Ecopark provides a total of 14 hectares of land in two phases for occupation by the recycling industry and is well equipped with facilities. The marine frontage provides 8 berthing spaces for (un)loading of marine cargo. Other facilities include a 460-metre marine frontage, a weighbridge, a multi-functional Administration Building and a state-of-the-art visitor centre. The visitor centre is the first education centre in Hong Kong thematised on solid waste management.
Administration building, visitor centre, plastics recycling education centre, marine frontage, weighbridge, solar system facilities, etc.
Send in the application form with information on the location, date, time, synopsis of the film, description of the scenes, size of the crew, use of government power supply and utilities, and details of any setting or alteration to the property.
Processing time : 10 working days for simple/straightforward cases.
$6,870 (basic charge) for the first 4 hours, $1,935 for each subsequent 4-hour block and a refundable deposit equal to the fees payable. Both are to be paid before filming.
If extra management company personnel is required to assist in the filming or extra services are involved, the actual cost plus overheads will be charged.
Applicants may be required to effect a public liability insurance covering damage to the property and any personal injury or death.
Compliments to the government and public bodies that have agreed to consider applications to hire premises or facilities under their management for location filming.