Shek Wu Hui Sewage Treatment Works was built in 1984. This major secondary treatment works is located in Shek Wu Hui in Sheung Shui and is 60,000 sq m in size. Most sewage facilities are located outdoors, with scattered low-rise buildings on the site.
Screw pumping station, mechanical bar screens, bio-reactor, final sedimentation tanks, UV disinfection system, filter press, etc
Call Assistant Departmental Secretary (Gen Admin 3) before sending in the application form with information on the exact location (with a location plan and specific address), date, time, brief description of scenes, size of the crew and number of vehicles.
Processing time : 6 working days after confirmation of all the required filming details.
$6,870 (basic charge) for the first 4 hours, $1,935 for each subsequent 4-hour block and a refundable deposit equal to the fees payable. Both are to be paid before filming.
If extra government personnel or equipment is required to monitor or take part in the filming, the actual cost plus overheads will be charged.
Lighting of fire or the use of fireworks, explosives and any inflammable materials are strictly prohibited.
Compliments to the government and public bodies that have agreed to consider applications to hire premises or facilities under their management for location filming.