Occupying a site area of 2 hectares, Ngau Tam Mei Closed Landfill is located near Mai Po Nature Reserve, and can be accessed via San Tam Road near San Tin Highway. The site is planted with many trees and converted into a woodland. It is divided into upper and lower areas connected by a staircase, with the upper area larger in size.
Send in the application form with information on the location, date, time, synopsis of the film, description of the scenes, size of the crew, use of government power supply and utilities, and details of any setting or alteration to the property.
Processing time : 7 working days for simple/straightforward cases. Longer processing time may be required for consultation with other government departments/ parties concerning the application.
$6,870 (basic charge) for the first 4 hours, $1,935 for each subsequent 4-hour block and a refundable deposit equal to the fees payable. Both are to be paid before filming.
If extra government personnel is required to assist in the filming or extra services are involved, the actual cost plus overheads will be charged.
Applicants shall effect a public liability insurance in the sum of $20 million in the joint names of the Government of the HKSAR, the operator of the closed landfill and the company at their own expense.
Compliments to the government and public bodies that have agreed to consider applications to hire premises or facilities under their management for location filming.